1 pcs : TPS75105EVM-174 - LED Lighting Development Tools LDO REGULATOR
    • 1 pcs : TPS75105EVM-174 - LED Lighting Development Tools LDO REGULATOR

    1 pcs : TPS75105EVM-174 - LED Lighting Development Tools LDO REGULATOR

    electronicparts-UK/M/595-TPS75105EVM-174
    £31.95
    Delivery: 7-10 business days
    Quantity
    10 Items

    Description
    31FL323x LED Lighting Development Boards ISSI 31FL323x LED Lighting Development Boards are development tools that evaluate ISSI multi-channel LED drivers. LED drivers are electrical circuits used to power light-emitting diodes. The fully assembled and tested board is powered by the Arm® Cortex®-M3 or 80C51 (IS31FL3235A-QFLS2-EB) with a 5V operating supply voltage. The evaluation boards have multiple display modes.
    Product Details
    electronicparts-UK/M/595-TPS75105EVM-174
    TPS75105EVM-174
    10 Items

    Data sheet

    Manufacturer
    TEXAS INSTRUMENTS
    Series
    TPS75105
    Product Type
    LED Lighting Development Tools
    Product Category
    LED Lighting Development Tools
    RoHS
    Details
    Brand
    Texas Instruments
    Product
    Evaluation Modules
    Factory Pack Quantity Factory Pack Quantity
    1
    Subcategory
    Development Tools
    Unit Weight
    10.750 g