1 pcs : NFAQ0860L33T - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 8A, Long lead 600V 8A L
    • 1 pcs : NFAQ0860L33T - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 8A, Long lead 600V 8A L

    1 pcs : NFAQ0860L33T - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 8A, Long lead 600V 8A L

    electronicparts-UK/M/863-NFAQ0860L33T
    ONSEMI
    £33.47
    Delivery: 7-10 business days
    Quantity
    10 Items

    Description
    Intelligent Power Modules (IPMs) onsemi Intelligent Power Modules (IPMs) are highly integrated solid-state power switches integrating gate-drive circuitry based on IGBTs or MOSFETs in a single module. IPMs also include protection for power systems from issues such as short circuits, under voltages, and extreme temperatures. IPMs using 600V IGBTs are used in consumer and industrial applications for driving fans, pumps, and compressors. IPMs using 40V and 80V MOSFETs are increasingly used in automotive applications to drive electric fans and pumps.
    Product Details
    ONSEMI
    electronicparts-UK/M/863-NFAQ0860L33T
    NFAQ0860L33T
    10 Items

    Data sheet

    Manufacturer
    ONSEMI
    Series
    NFAQ0860L33T
    Maximum Operating Temperature
    + 125 C
    Minimum Operating Temperature
    - 40 C
    Mounting Style
    Through Hole
    Type
    3 Phase
    Output Current
    8 A
    Product Type
    Motor / Motion / Ignition Controllers & Drivers
    Product Category
    Motor/Motion/Ignition Controllers & Drivers
    Packaging
    Tube
    RoHS
    Details
    Brand
    onsemi
    Factory Pack Quantity Factory Pack Quantity
    400
    Subcategory
    PMIC - Power Management ICs
    Operating Supply Current
    950 uA