1 pcs : NFAQ1560R43TL - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 15A, EMI optimized ver
    • 1 pcs : NFAQ1560R43TL - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 15A, EMI optimized ver

    1 pcs : NFAQ1560R43TL - Motor/Motion/Ignition Controllers & Drivers Intelligent Power Module (IPM), 600V, 15A, EMI optimized ver

    electronicparts-UK/M/863-NFAQ1560R43TL
    ONSEMI
    £23.78
    Delivery: 7-10 business days
    Quantity
    10 Items

    Description
    Motor Driver ICs onsemi Motor Driver ICs are ideally suited for a variety of applications. These onsemi motor drivers range from models supporting the actuators in camera phones and digital cameras to models designed for use in office automation products, electrical home appliances, and automotive electrical systems. onsemi motor driver ICs provide small dimensions, low power, and high efficiency.
    Product Details
    ONSEMI
    electronicparts-UK/M/863-NFAQ1560R43TL
    NFAQ1560R43TL
    10 Items

    Data sheet

    Manufacturer
    ONSEMI
    Series
    NFAQ1560R43TL
    Maximum Operating Temperature
    + 125 C
    Minimum Operating Temperature
    - 40 C
    Mounting Style
    Through Hole
    Type
    3 Phase
    Output Current
    15 A
    Product Type
    Motor / Motion / Ignition Controllers & Drivers
    Package/Case
    DIP-38
    Product Category
    Motor/Motion/Ignition Controllers & Drivers
    Packaging
    Tube
    Brand
    onsemi
    Product
    Brushless DC Motor Controllers
    Factory Pack Quantity Factory Pack Quantity
    400
    Subcategory
    PMIC - Power Management ICs
    Operating Supply Current
    950 uA