1 pcs : FKP2C021501I00HSP1 - Film Capacitors .015uF 63V 2.5% PCM5 LONG LEAD
    • 1 pcs : FKP2C021501I00HSP1 - Film Capacitors .015uF 63V 2.5% PCM5 LONG LEAD

    1 pcs : FKP2C021501I00HSP1 - Film Capacitors .015uF 63V 2.5% PCM5 LONG LEAD

    electronicparts-UK/M/505-FKP2.015/63/2.5L
    WIMA
    £8.82
    Delivery: 7-10 business days
    Quantity
    10 Items

    Description
    FKP 02 Plastic Film Capacitors WIMA FKP 02 Plastic Film Capacitors offer outstanding performance for HF decoupling in the field of high frequencies. The PCM 2.5mm foil version capacitors are available in a capacitance range of 33pF to 0.033µF and a voltage range from 63VDC to 1000VDC. Features include pulse duty construction, vert low low dissipation factor and dissipation factor, tolerances up to ±2.5%, and negative capacitance change versus temperature. FKP 02 capacitors are ideal for applications with limited space requirements and high packing density.
    Product Details
    WIMA
    electronicparts-UK/M/505-FKP2.015/63/2.5L
    FKP2C021501I00HSP1
    10 Items

    Data sheet

    Manufacturer
    WIMA
    Capacitance
    0.015 uF
    Tolerance
    0.025
    Width
    6.5 mm
    Height
    8 mm
    Length
    7.2 mm
    Series
    FKP 2
    Maximum Operating Temperature
    + 100 C
    Minimum Operating Temperature
    - 55 C
    Type
    Film and Foil Capacitors
    Product Type
    Film Capacitors
    Termination Style
    Radial
    Product Category
    Film Capacitors
    RoHS
    Details
    Brand
    WIMA
    Product
    AC and Pulse Film Capacitors
    Factory Pack Quantity Factory Pack Quantity
    100
    Subcategory
    Capacitors
    Unit Weight
    765.226 mg
    Voltage Rating DC
    63 VDC
    Capacitance - nF
    15 nF
    Capacitance - pF
    15000 pF