1 pcs : NFAQ1560R43T - Discrete Semiconductor Modules DIPS6 V3 RC, 600V/15A LONG LEAD
    • 1 pcs : NFAQ1560R43T - Discrete Semiconductor Modules DIPS6 V3 RC, 600V/15A LONG LEAD

    1 pcs : NFAQ1560R43T - Discrete Semiconductor Modules DIPS6 V3 RC, 600V/15A LONG LEAD

    electronicparts-UK/M/863-NFAQ1560R43T
    ONSEMI
    £51.39
    Delivery: 4-7 business days
    Quantity
    10 Items

    Description
    Intelligent Power Modules (IPMs) onsemi Intelligent Power Modules (IPMs) are highly integrated solid-state power switches integrating gate-drive circuitry based on IGBTs or MOSFETs in a single module. IPMs also include protection for power systems from issues such as short circuits, under voltages, and extreme temperatures. IPMs using 600V IGBTs are used in consumer and industrial applications for driving fans, pumps, and compressors. IPMs using 40V and 80V MOSFETs are increasingly used in automotive applications to drive electric fans and pumps.
    Product Details
    ONSEMI
    electronicparts-UK/M/863-NFAQ1560R43T
    NFAQ1560R43T
    10 Items

    Data sheet

    Manufacturer
    ONSEMI
    Series
    NFAQ1560R43T
    Maximum Operating Temperature
    + 125 C
    Minimum Operating Temperature
    - 40 C
    Mounting Style
    Through Hole
    Type
    3 Phase IGBT
    Product Type
    Discrete Semiconductor Modules
    Configuration
    3 Phase Inverter
    Package/Case
    DIP-38
    Product Category
    Discrete Semiconductor Modules
    Packaging
    Tube
    RoHS
    Details
    Brand
    onsemi
    Product
    Intelligent Power Modules
    Factory Pack Quantity Factory Pack Quantity
    400
    Subcategory
    Discrete Semiconductor Modules
    Pd - Power Dissipation
    50 W
    Vf - Forward Voltage
    2 V